Project History

 
 

MSS (Mission Support System)

Respond to fault reports and software change requests, originating from the users (the RAF), and develop and test solutions. Both UNIX (Tru64) and OpenVMS plaforms were used, along with Oracle RDB and C, SQL, DCL and UNIX shell script.

Dec 2001
- May 2002

 
 

SMSC (Short Message Service Centre)

Code and test enhancements for Sema’s SMSC v8.1 and v9.0, incorporating support for GPRS &c. Customers include Vodafone. Used SMS protocols (USSD, OIS, SMPP), Intelligent Networks (IN) and DEC SS7.

Oct 2000
- Nov 2001

 
 

On-site support, testing and upgrades

System support  for ESKOM (the main electricity company in South Africa): plan, prepare, liaise with customer, installation test site in Pretoria and test software fixes and upgrades of Schneider PM's Milenium 8501 system. Finally install and test the accepted new release of the software at ESKOM's control centres at Johannesburg, Pietermaritzburg, Cape Town and Witbank.

Nov 1999 
- Jun 2000

 
 

Y2K test programme

Year 2000 test programme for ENDESA (the main electricity supplier in Spain) and UNELCO (the main electricity supplier in the Canary Islands): developing the test plan, agreeing it with the customer, building a replica system and organising the test team.

Jun 1999 
- Oct 1999

 
 

Y2K test programme and customer system support

System support  for Yorkshire Electricity, Eastern Electricity and ENDESA.  Developed and organised the Eastern Electricity Year 2000 test programme.

Jul 1998
- May 1999

 
 

Software development

Software development project to upgrade the WESDAC32 SCADA platform for Schneider PM.

Jan 1997 
- Jun 1998

 
 

Customer system support and on-site upgrades

System support  for Eastern Electricity, ENDESA, and UNELCO. Planned, developed, installed, and tested software fixes and upgrades on the operational systems on site, while helping to build the customer's confidence in the system.  Other customers included MTRC, (the Hong Kong Mass Transit Railway Company), OPA (the Oil Pipeline Agency in the U.K.) and the Tyne & Wear Metro in Newcastle.

Jul 1994 
- Dec 1996

 
 

Major SCADA system development project

Software development of a large SCADA system for Eastern Electricity, using the WESDAC32 and HABITAT platform. This was a major 5 year project,  which included  supervision, the preparation of design specifications to the customer's requirements, software coding, factory acceptance testing, installation of the system on site, site acceptance testing, live commissioning and cut over and the installation of additional facilities.

This project was a major technical challenge because of the unprecedented size of the telemetry database,and the quick response times required by the system.  It required the building of a solid relationship with the customer in order to specify and deliver an acceptable system.

Mar 1989 
- Jun 1994

 
 

Language compiler

Software development project to produce a pensions calculations language for UPS International Ltd, including a language compiler and run-time support system. Environment:   MS-DOS, VMS and INGRES, C (Microsoft C and VAX C).

Apr 1988 
- Mar 1989

 
 

Device drivers

Modification of RSX11M device drivers for image processing for Crosfield Electronics.

Jan 1988 
- Mar 1988

 
 

Device drivers

Development of a VMS device driver to emulate theUNIX pipe driver, and for emulating UNIX file access under VMS for British Telecom Research Laboratories, Martlesham Heath.

Jun 1987 
- Dec 87

 
 

X.25 Communications sub-system and device drivers

Development of the communications software for an Urban Traffic Control (UTC) system running on distributed processors for Kent County Council. It required full duplex X.25 communications between 4 PDP 11/84s and 5 DEC Professional Workstations by serial line. This was done for Plessey Controls Limited, Poole.

Jun 1986 
- Jun 1987

 
 

 